Some checks failed
Build and Test / build (pull_request) Failing after 2m2s
Add Category column to Phase 2 cherry-pick table: - 16 × Category 1 (Extension points) — KEEP - 16 × Category 2 (Branding/theming) — KEEP, minimize - 4 × Category 3 (Bug fixes) — UPSTREAM candidates Add upstream verification for Category 3 patches: - #26/#27 (Wayland scaling, menu icon size): partially upstream, menu pref not contributed - #31 (window flickering): not upstream, good PR candidate - #33 (ToolBarItem/reportException): Kindred-internal only Update Assembly fixes with verified upstream status: - All 4 patches still needed (joint flip, SIGSEGV, datum plane/point handling) - App::Line handling fixed upstream via FreeCAD PR#20026 Closes #254.